Drawing and interface review
We confirm the overall envelope, panel and door openings, mounting interfaces, cable entry, hardware, and the finish specification.
Checkpoint
Mounting and opening interfaces agreed before cutting.
Enclosures, chassis, racks, and cabinets fabricated to your drawing: cut, formed, welded, hardware-fitted, finished, and inspected as one assembly, with opening and mounting interfaces agreed before cutting.
For a useful quote: Send CAD or drawings, material and thickness, overall envelope, opening and mounting interfaces, hardware, finish, quantities, and delivery destination.
✓ Prototypes From 1 Piece ✓ ISO 9001, 14001 & 45001 ✓ Agreed Inspection Plan
In-house factory in Dongguan, China - we fabricate, not just trade
Quality System
ISO 9001
Manufacturing Lead Time
Quoted by Scope
1,500+
Projects Completed
25+
Countries Served
20+
Years Experience
Dongguan
China Factory
Fabex operates certified management systems for quality, environment, and occupational health and safety.
GB/T 19001-2016 quality management system
Environmental management system
Occupational health and safety management system
Enclosure capability
An enclosure is an assembly, not a folded box. The drawing has to set the opening and mounting interfaces, the sealing provisions, the hardware, the finish, and the inspection that proves the fit.
| Capability | Fabex scope | Engineering checkpoint |
|---|---|---|
| Enclosure scope | Chassis, cabinets, racks, panels, and housed assemblies built from sheet metal | The scope defines which enclosure parts are fabricated and assembled for the order and which are supplied or handled separately. |
| Material and thickness | Sheet metal typically 0.6–5 mm; SPCC, SGCC, SECC, aluminium 5052, SUS304, and other drawing-specified grades | The range covers the sheet-metal processes listed here; the machine limit for a specific feature is confirmed against the drawing. |
| Assembly envelope | A single fabricated part can be reviewed up to 5 m × 3 m × 3 m, with shipping pieces targeting about 2.3 m | A project-review envelope is not a routine shipping promise. Large enclosures are normally split into pieces and assembled on site. |
| Sealing and gasket provisions | Seams, gasket lands, doors, and openings fabricated to the drawing | An ingress rating applies to the assembled enclosure tested to the specified standard. Fabricating the gasket land supports that result; testing and certification sit with the finished product. |
| Hardware and finish | Hardware and inserts fitted by drawing; powder coating typically 60–120 µm, wet paint, and coordinated galvanizing, anodizing, or plating | Which finishes are in-house and which are coordinated is stated with the quotation, because it affects both cost and schedule. |
Send your drawing, material, quantity, and delivery target. Our team will review the process route, manufacturability risks, and open questions before quotation.
Enclosure control
Most enclosure rework comes from access and interface problems discovered after forming and welding, when they are expensive to correct.
We confirm the overall envelope, panel and door openings, mounting interfaces, cable entry, hardware, and the finish specification.
Checkpoint
Mounting and opening interfaces agreed before cutting.
We set the flat pattern, bend sequence, joining strategy, insert placement, and the order in which finishing and assembly happen.
Checkpoint
Every interface stays reachable after assembly.
We cut, form, and join, fit hardware, then apply the specified finish with masking where the drawing requires it.
Checkpoint
Fitted hardware and masked areas survive finishing intact.
We assemble, check overall dimensions and interface fit, and provide the records included in the agreed scope.
Checkpoint
Assembled enclosure released against the agreed inspection plan.
How we plan your project
See the commercial and engineering checkpoints Fabex uses to move this type of job from drawing review into controlled production.
Application
Drawing-defined sheet metal parts and assemblies
Material
Drawing-specified material and thickness
Quantity
Prototype through repeat production
Lead time
Confirmed after DFM and material review
An enclosure needed repeatable mounting interfaces, clean openings, and a consistent visible finish across a production batch.
We review the opening and mounting datums, set the flat pattern and bend sequence, control the finish, and verify the interfaces on the assembled unit.
Documented DFM findings, a proposed manufacturing route, quotation, and lead-time plan for your approval.
Enclosure questions
Answers about size, access, sealing, hardware, and finish.
One standalone fabricated part can be reviewed up to 5 m long × 3 m wide × 3 m high, but that is a project-review envelope rather than a shipping promise. Most shipping pieces should target about 2.3 m in the relevant dimension for container and truck compatibility, so large enclosures are normally split into parts and assembled on site.
Fabex fabricates the seams, gasket lands, doors, openings, and hardware that the drawing specifies. An ingress rating applies only after the complete assembled enclosure is tested to the required standard in its final configuration, and that testing is the buyer’s product-level obligation — the same principle that applies to CE and RoHS.
Yes, by drawing. Specify the insert or fastener standard, material, thread, position, and whether it is fitted before or after finishing. Insert placement and masking are confirmed during DFM because they change the finishing sequence.
Most fabricated work uses 0.6–5 mm material, with bending commonly 0.6–3.5 mm. The thickness that suits an enclosure depends on span, stiffness, weight, mounting loads, and whether the surface is structural or cosmetic.
In-house automated powder coating suits lighter parts, and a wet-paint shop handles large or heavy fabrications, with typical powder build of 60–120 µm depending on specification. Coordinated specialist processes include hot-dip galvanizing, electro-galvanizing, anodizing, passivation, PVD, and plating.
The finish is quoted against the exposure and the coating system the drawing or specification names. For outdoor and coastal work that normally means hot-dip galvanizing to a stated coating mass or thickness, or powder coating over a properly prepared substrate, with the target film build and inspection method stated in the quotation. Where the drawing calls for a pre-coated substrate instead, zinc–aluminium–magnesium coated steel such as Magnelis S250GD+ZM310 or SGH340D+ZMA275 is quoted for the same outdoor duty. Hot-dip galvanizing is a coordinated specialist process rather than an in-house line, so the quotation says which operations are in-house and which are coordinated — that affects both cost and schedule.
Send the 3D model or dimensioned drawing, material and thickness, overall envelope, opening and mounting interfaces, hardware and insert requirements, finish and colour, quantities and annual demand, and the delivery destination. Mark every feature that is critical to fit or function.
Yes, on request. Material certificates or datasheets are supplied from our material vendors when your order, or your own customer, needs the paperwork — they do not accompany every order as standard. If a specific certificate standard is mandatory for your product, say so with the drawing and it will be confirmed in the quotation.
Engineering before production
A useful fabrication quote begins with the manufacturing route, critical interfaces and realistic tolerances, not only a CAD model.
View the complete sheet metal DFM guideApply tight tolerances only to datums, mating features and functions that need them. Process and size govern what is practical; unnecessary precision adds setups, inspection, cost and lead time.
Standardize bend radii, hole sizes, hardware and material thickness wherever the design permits.
Check cutting, bending, welding, finishing, inspection and assembly access before releasing the drawing.
Customer feedback
Selected customers
“Fabex support is important to our continued success. Full R&D support makes our cooperation so smooth.”
Tonghua Xiao · Sourcing Manager, Manufacturing Department · Huawei
“It is such a good decision that we went with Fabex for this critical and time-demanding project. We will have projects for you.”
Jessica · Director of Sourcing · Sunglow
“It is amazing how Fabex helped our crazy growth in power and new energy products. Excellent quality, and always delivered on time.”
James Pan · Director of Purchasing · Sinexcel
Production programs, repeat orders and long-term supply.
We keep the approved programs, settings, finish standard and inspection records, so your next order runs to the same specification as the first.
We do not publish a customer's name, product, drawing or project details without written permission. The same discretion applies to your designs.
Send your drawings and requirements for an engineering review, project-specific quotation, and manufacturing plan.